Alpha Technologies Inc.
Phone: 360 647 2360
Email: alpha@alpha.com
Metered Enclosures
Alpha Metered UPE-M Enclosure
  • Engineered to accomodate broadband powering applications
  • Internal or external SUSE rated service entrance options available
  • Enclosures are CSA/UL certified to meet applicable industry standards
  • Aluminum welded construction and durable powdercoat finish exterior
  • Portable generator cabling access door
  • Multiple enclosure accessories and options available


The UPE-M Series provide the cable operator a fully enclosed meter enclosure system meeting EUSERC requirements including high interrupt current protection. In addition to the power supply equipment tray and sliding battery drawers, the UPE-M Series enclosure system includes integral line lugs, meter base, internal wiring and internal breaker.
Alpha Metered Ground Mount
General Specifications
Material:Exterior powdercoated aluminum
Vent Screen:Mesh fabric with .005 x .005in / .12 x .12mm opening size to minimize snow, water and dust ingress
Door and Lid Seal:Poron gasketing
Color:Gray (Custom colors available)
Lid:Removable
Door:Removable/Lockable
Ground Mount:Precast polymer concrete pad (optional)
Tamper Switch:Optional
Battery Side Tray:Optional
Mechanical Specifications
Models: UPE-M3 UPE-M6 UPE-M8
Dimensions H x W x D (in/mm): 45 x 26 x 19.7 / 1143 x 660 x 482 57.3 x 26 x 19.7 / 1455 x 660 x 482 50 x 32 x 20.5 / 1270 x 813 x 521
Weight (lb.kg): 100 / 44 (without batteries) 130 / 59 (without batteries) 140 / 64 (without batteries)
UPE-M Configurations UPE-M3 UPE-M6 UPE-M8
Document Downloads
Title Type Version Date
Alpha UPEM Metered Enclosures Datasheet_English Datasheet 049-092-12-003 March 1, 2009
UPE-M Series Installation and Operation Manual_English Manual 031-145-C0-002 Rev. B November 1, 2004
BSM-4 Installation Manual Manual 033-078-C1-001, Rev A June 1, 2006
SPI Installation Instructions Manual 745-997-C0-001 Rev. A August 1, 2008
BSM-3 Installation Manual Manual 033-082-C0-002 Rev. B June 1, 2006
Security Bar Field Installation Instructions Manual 745-847-C2-001, Rev. A August 1, 2006


You might also be interested in these other Alpha products:
Battery Heater Mats
For Cold Weather Apps
Battery Integration Tray (BIT)
Wire Management Option
Precast Pads
For Easy Field Installation
Surge Protection
LA and SM Series